site banner

2017 Central Valley Flood Protection Plan Update:
Appendixes, Attachments, and Supporting Documents

The 2017 Central Valley Flood Protection Plan (CVFPP) Update was released on December 30, 2016, for public comment. In mid-2017, it will be submitted to the Central Valley Flood Protection Board for adoption. A series of supporting documents accompany the 2017 CVFPP Update to provide a detailed technical, policy, and legal foundation. These supporting documents will not be recommended by DWR for CVFPB adoption.

2017 Update to the Central Valley Flood Protection Plan

Appendix

Attachments

CEQA Documentation

Supporting Documents

  1. Draft 2016 Central Valley Flood Protection Plan Conservation Strategy
  2. Draft Sacramento River Basin-wide Feasibility Study (2016)
  3. Draft San Joaquin River Basin-wide Feasibility Study (2017) Updated
  4. Regional Flood Management Planning Summary
  5. Draft Central Valley Flood Protection Plan Investment Strategy Technical Memorandum New
  6. Draft Flood System Long-Term Operation, Maintenance, Repair, Replacement and Rehabilitation (OMRR&R) Cost Evaluation Technical Memorandum (PDF: 6.6 MB)
  7. Draft Multi-Objective Operation and Maintenance Case Studies Technical Memorandum
  8. Scenario Technical Analysis Summary Report, Public Draft (PDF: 3.4 MB) New
  9. Central Valley Flood Protection Plan Climate Change Analysis Technical Memorandum
    • Attachment A: Phase 2A Analysis
    • Attachment B: Phase 2B Analysis
  10. Draft Sacramento River Basin Channel Capacity Atlas
  11. Urban Levee Design Criteria (2012)
  12. Urban Level of Flood Protection Criteria (2013)
  13. Central Valley Flood Protection Plan Accomplishments Record
  14. Central Valley Flood Protection Plan Engagement Record
  15. Contributing Authors and Work Group Members List